Building a Mine With Just a PEA

Patrick Daniels

A PEA is a Preliminary Economic Assessment, one of the first steps in determining the economic viability of a mineral resource.

Learn More

Meya Project: A Source of Sierra Leone's Large Type IIa Diamonds

Jarek Jakubec

Type IIa diamonds make up 1–2% of all natural diamonds. They are almost or entirely devoid of impurities, and consequently are usually colorless and have the highest thermal conductivity. This presentation shows how they are extracted from the Meya Project in Sierra Leone.

Learn More

Global Business Reports: Western USA Mining 2024 - Interview with SRK´s Jeff Parshley

Jeff Parshley

In this interview, Jeff Parshley, Corporate Consultant at SRK Reno, shares what is driving the future for SRK in the mining industry and some thoughts on mine closure and its impact.

Learn More

SRK Consulting Gives Perspective on the Growing Critical Minerals Industry | The Northern Miner Podcast

The Northern Miner's CEO Spotlight Interview features Terry Braun, SRK Consulting’s managing practice leader (North America).

Watch Video

Annualized Probabilities of Pit Slope Failures for Quantitative Risk Analysis

Franco Oboni, Cesar Oboni, Luis-Fernando Contreras

In the realm of open pit mining, assessing the risks associated with pit slope failures is paramount for ensuring safety and optimizing economic returns.

Learn More

Implementing a Stability Monitoring System at a Legacy Mine Site — Case Study

Olga Gibbons, Alida Hartzenberg, Adrienne Joaquim, Tim Coleman

The benefits of the selected monitoring system and each system component are addressed in this paper, including the challenges resulting from the geographical location, rock mass conditions, and maintenance due to the remoteness of the site.

Learn More